BGA Realism changes the biogas plants in FS25 into complete facilities that follow process biology. Substrates are no longer handled through fixed recipes. They break down in the digester over around 45 days and create methane. Temperature, fill level, stirring and the substrate mixture determine how much gas is generated.

Features

  • With Ctrl + B or ESC → Productions, the custom dashboard opens and provides an overview of digesters, tanks, gas/CHP, agitator, digestate, analysis and settings
  • The plant is commissioned using 500 m³ of starter digestate
  • Dosage takes place through the input bunker, while slurry is delivered straight into the digester
  • Digesters, secondary digesters and storage tanks have agitators that can run automatically or manually
  • Digestate follows a cascade from the digester to the secondary digester and then to the storage tank, with manual pumping routes also available
  • There is gas storage, a CHP unit with adjustable output and a gas flare for surplus gas
  • Electricity and heat can be sold, with own consumption deducted. Grid electricity and external heat are billed monthly
  • Digestate can be analysed in the laboratory, including N/P/K, and the result can be transferred to Precision Farming
  • The savegame file bgaRealism.xml contains editable fill levels and substrate mixture
  • Images are included in the in-game help under ESC → Help
  • Multiplayer-compatible
  • Process biology breaks down substrates over around 45 days and produces methane according to temperature, fill level, stirring and substrate mixture

Specifications

  • The base-game biogas plants are included as complete facilities in 99 kW, 250 kW, 500 kW and 1 MW versions
  • Tank capacities have been measured from the models

Compatible with:

  • Pumps N’ Hoses Pack (DLC): modular facilities with digester, secondary digester, storage tank, V-BIO/DOB bunker, 2G CHP unit and gas flare
  • FS25_AdvancedSilageTypes: maize, grass, clover and alfalfa silage tracked separately
  • FS25_MediumBiogasPlantPackage: 400 kW and 750 kW biogas plants as complete facilities
  • FS25_BGA_Construction_Kit: bunker facilities from 150 kW to 1.5 MW as complete facilities
  • Precision Farming: nitrogen value from the laboratory analysis

Changelog

  • V1.2.0.0
    Slurry Separator (Pumps N’ Hoses): The stationary separators, including tower, box and shed, are now integrated. The thin phase is returned to the digester, while the solid phase ends up in a pile beneath the separator and can be picked up with a bucket. If a trailer is positioned directly under the pipe, it will be filled instead. Set the quantity per day and Automatic/Off via the dashboard, R at the wrench. The overview map shows the separator and the slurry route.
    English help graphics: When the game language is set to English, the images in the help section are now also displayed in English.
  • V1.1.0.0
    The four BGA lines in the financial overview were displayed as “Missing ‘finance_bgaRealism…’ in l10n_de.xml” instead of their names. They now show the correct names: BGA electricity sales, BGA heat sales, BGA grid electricity purchase and BGA external heat purchase.
  • V1.0.0.0
    The new dashboard gives every page a dark control room design. Its overview contains a live flow diagram from bunker to fermenter, post-digester and storage, together with the gas storage, CHP unit and flare.
    The added pages cover Biology with traffic-light scales, Gas & Energy with a 24-hour history and marked feeding times, Agitator with an agitation schedule, Digestate with a 14-day storage forecast, and Feeding with a what-if calculator.
    A message bar provides alerts, for example if the storage is almost full, the bunker is empty or the gas storage is nearly full.
    Feeding: The amount is worked out automatically from the bunker contents and consumption period. Manual feeding accepts up to 8 t at once. The plant then returns to automatic mode and dispenses only half as much for 2 hours. CCM, corn meal, grain meal and protein meal from the CCM Production Pack can be used as substrates.
    Gas Production: Every substrate has a fast fraction and a slow fraction. Gas production rises immediately after feeding and then decreases gradually.
    Tanks & Pumps: The pumping diagram supports manual pumping with a specified quantity, independently of the 95% cascade. A new route sends material from the post-digester to the fermenter as recirculation. The fermenter always retains 500 m³ of inoculant material. Multiple tanks of one type are combined and shown individually. Tanks constructed later are detected. Each tank can have its agitation interval and duration set separately.
    Precision Farming: Every plant has its own laboratory analysis. Each tanker stores the plant where it was filled. The PF display and fertilization use that plant’s nitrogen value. Digestate from multiple plants in one tanker is averaged according to quantity. When several tankers operate simultaneously, each calculates with its own value.

Author: CHuCKY232
This content was uploaded by website visitors. If you notice any mistake, please let us know.


Finding a game interesting after investing 300 hours into it can become a bit challenging. But with mods as long as there is a new update is assured, you are guaranteed a few more hours of new exciting gameplay. FS 25 Other Mods are one of the greatest upgrades and can make your game unique. Downloading and adding FS25 Realistic biogas plants V1.2.0.0 Mod to your game is not difficult at all - you simply need to save a file and run it.



You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *