




FS25 Realistic biogas plants V1.1.0.0
BGA Realism changes the biogas plants in FS25 into realistic facilities based on process biology. The substrates are no longer handled through fixed recipes. Instead, they break down in the digester over around 45 days and create methane. Gas production is affected by temperature, fill level, stirring and the substrate mixture.
Features
- Custom dashboard (Ctrl + B or ESC → Productions) providing an overview of digesters, tanks, gas/CHP, agitator, digestate, analysis and settings
- Commissioning requires 500 m³ of starter digestate
- Dosage through the input bunker, with slurry fed directly into the digester
- Digesters, secondary digesters and storage tanks have agitators that can operate automatically or manually
- Digestate cascade: digester → secondary digester → storage tank, with additional manual pumping routes
- Gas storage, a CHP unit with adjustable output and a gas flare for surplus gas
- Electricity and heat can be sold; own consumption is deducted. Grid electricity and external heat are billed monthly
- Laboratory analysis of digestate (N/P/K), including transfer to Precision Farming
- Base-game biogas plants (99 kW, 250 kW, 500 kW, 1 MW) are provided as complete facilities, with tank capacities measured from the models
- Savegame file
bgaRealism.xmlcontaining editable fill levels and substrate mixture - In-game help with images is available under ESC → Help
- Multiplayer-compatible
Compatible with:
- Pumps N’ Hoses Pack (DLC): modular facilities with digester, secondary digester, storage tank, V-BIO/DOB bunker, 2G CHP unit and gas flare
- FS25_AdvancedSilageTypes: maize, grass, clover and alfalfa silage tracked separately
- FS25_MediumBiogasPlantPackage: 400 kW and 750 kW biogas plants as complete facilities
- FS25_BGA_Construction_Kit: bunker facilities from 150 kW to 1.5 MW as complete facilities
- Precision Farming: nitrogen value from the laboratory analysis
Help only on Discord:
Changelog
- V1.1.0.0
In the financial overview, the four BGA lines appeared as “Missing ‘finance_bgaRealism…’ in l10n_de.xml” rather than showing their names. The correct names are now displayed:
BGA electricity sales
BGA heat sales
BGA grid electricity purchase
BGA external heat purchase - V1.0.0.0
New Dashboard
The dashboard pages now have a dark control room design. A live flow diagram in the overview shows bunker → fermenter → post-digester → storage, together with the gas storage, CHP unit and flare.New pages:
Biology with traffic-light scales
Gas & Energy with a 24-hour history and marked feeding times
Agitator with an agitation schedule
Digestate with a 14-day forecast for the storage
Feeding with a what-if calculatorA message bar provides alerts, for example when the storage is almost full, the bunker is empty or the gas storage is nearly full.
Feeding
The automatic amount uses the bunker contents and consumption period for its calculation. Manual feeding permits up to 8 t at once. The plant then returns to automatic mode and dispenses only half as much for 2 hours. CCM, corn meal, grain meal and protein meal from the CCM Production Pack can be used as substrates.Gas Production
Every substrate now consists of a fast and a slow fraction. Gas production rises immediately after feeding and then gradually decreases.Tanks & Pumps
The pumping diagram supports manual pumping with a specified quantity, independently of the 95% cascade. A new recirculation route runs from post-digester → fermenter. The fermenter always retains 500 m³ of inoculant material. Multiple tanks of the same type are combined and shown individually. Tanks built later are detected. Each tank can have its agitation interval and duration set separately.Precision Farming
Every plant has its own laboratory analysis, and each tanker remembers the plant where it was filled. The PF display and fertilization use that plant’s nitrogen value. Digestate from multiple plants in one tanker is averaged by quantity. When several tankers operate at the same time, each calculates with its own value.






