





FS25 Realistic biogas plants BETA
BGA Realism changes the biogas plants in FS25 into realistic facilities based on process biology. Substrates are no longer processed through fixed recipes. They break down in the digester over around 45 days and create methane, while gas production is affected by temperature, fill level, stirring and the substrate mixture.
Features
- Custom dashboard (
Ctrl + BorESC → Productions) providing overviews for digesters, tanks, gas/CHP, stirrer, digestate, analysis and settings - Commissioning requires 500 m³ of starter digestate
- Dosing is carried out through the feed bunker, while slurry enters the digester directly
- Digesters, post-digesters and storage tanks have automatic or manual stirrers
- Digestate cascade from digester to post-digester and then storage tank, with additional manual pumping routes
- Gas storage, CHP with adjustable output and a gas flare for surplus gas
- Electricity and heat can be sold, with own consumption deducted. Grid electricity and external heat are billed monthly
- Laboratory analysis checks digestate for N/P/K and transfers the result to Precision Farming
- Base-game biogas plants are available as complete facilities with 99 kW, 250 kW, 500 kW and 1 MW capacities. Tank capacities are measured from the models
- The savegame file
bgaRealism.xmlcontains editable fill levels and substrate mixture - In-game help with images is available under
ESC → Help - Multiplayer compatible
Specifications
- Base-game biogas plant capacities: 99 kW, 250 kW, 500 kW and 1 MW
- Substrate breakdown time: around 45 days
- Starter digestate for commissioning: 500 m³
Compatible with:
- Pumps N’ Hoses Pack (DLC): modular facilities with digester, post-digester, storage tank, V-BIO/DOB bunker, 2G CHP and gas flare
- FS25_AdvancedSilageTypes: corn, grass, clover and alfalfa silage handled separately
- FS25_RealSilage: spoiled silage as a substrate, only together with AdvancedSilageTypes
- FS25_MediumBiogasPlantPackage: 400 kW and 750 kW biogas plants as complete facilities
- FS25_BGA_Construction_Kit: bunker facilities from 150 kW to 1.5 MW as complete facilities
- FS25_ProductionControl: automatically ignored at biogas plants
- Precision Farming: nitrogen value from the laboratory analysis






